The work consists of carefully rmoving existing precast, paver, foam concrete and waterproofing, structures and services on the top of roof slabs and water collecting areas of third floor terrace including cleaning the surface and repairing cracks.
Home » Waterproofing work at third floor terrace and replacement of rain water downpipes at Lanka hospital, Narahenpita.
The work consists of carefully rmoving existing precast, paver, foam concrete and waterproofing, structures and services on the top of roof slabs and water collecting areas of third floor terrace including cleaning the surface and repairing cracks.
Building Projects, Completed, Institutional Buildings
Building Projects, Completed, Refurbishment/Renovation
Building Projects, Commercial Complex, Completed
Building Projects, Completed, Hospitals
Building Projects, Completed
Building Projects, Completed, Hospitals
Building Projects, Completed
Subscribe our newsletter to get all our cool news.
Copyright © 2025 Manamperi Engineering, All Rights Reserved