Home » Construction of main canal in Pannalagama,drop cum canal at Gonagolla, box culvert cum canal in Yaya 04 drainage, Drainage in Sengapadai and Improvement to down stream of drop structure in Illukkuchenai in Ampara
Construction of canel and repair damaged turn-out gates in main canal Pannalagama, Drop Cum Canal at Gonagolla, Box Culvert Cum Canal in Yaya 04 Drainage, Drainage in Sengapadai, and Improvement to Downstream of Drop Structure in Illukkuchenai” in Ampara.
Client:
Director of Irrigation - Ampara
Consultant /Engineer:
Director of Irrigation - Ampara
Location:
Ampara
Contract Sum:
22,573,525.87
Category:
SHARE:
Subscribe our newsletter to get all our cool news.
Copyright © 2025 Manamperi Engineering, All Rights Reserved